Eco-Railing 111b installed in Vught
Recently, the Euvelgunne bridge on the Aanpak Ring Zuid project was put into service by Combinatie Herepoort. Saferoad Holland B.V. has delivered the Barrier and guide rail with a custom solution, so that the bridge can “just” open and close.
VID-20230831-WA0001 from Saferoad Group on Vimeo.